The project has completed the construction of bored piles. Along with testing the load of the bored pile both static load test and dynamic load test which the test result is satisfactory.
The project has completed the construction of bored piles. Along with testing the load of the bored pile both static load test and dynamic load test which the test result is satisfactory.